Beneath the mast there is the electronics-equipment (blue cube). They wantHarryvL wrote: ↑Fri Jul 27, 2018 5:11 pmWhy not anchor in the rock rather than removing it Thomas?thschrader wrote: ↑Fri Jul 27, 2018 4:20 pm ... we have to remove much more rock as expected.
(But how: explosives?)
it at street level for better maintenance. I have send a mail to the contractor.
The location is to far away from the slope, 7,5 m. That is only a narrow path. At the actual
position we get an excavation (yellow) of min 100 m^3.