Ticket #6115 - Path toolbox operation order
Ticket #6115 - Path toolbox operation order
Is there any way to change operation order when several operations created under job->operations? Drag and drop doesn't seem to work.
OS: Debian GNU/Linux 10 (buster)
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.18.16093 +53 (Git)
Build type: Unknown
Branch: (HEAD detached at 0.18.4)
Hash: 980bf9060e28555fecd9e3462f68ca74007b70f8
Python version: 3.7.3
Qt version: 5.11.3
Coin version: 4.0.0a
OCC version: 7.3.0
Locale: English/UnitedStates (en_US)
OS: Debian GNU/Linux 10 (buster)
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.18.16093 +53 (Git)
Build type: Unknown
Branch: (HEAD detached at 0.18.4)
Hash: 980bf9060e28555fecd9e3462f68ca74007b70f8
Python version: 3.7.3
Qt version: 5.11.3
Coin version: 4.0.0a
OCC version: 7.3.0
Locale: English/UnitedStates (en_US)
Last edited by Kunda1 on Fri Feb 11, 2022 1:05 pm, edited 2 times in total.
Reason: Added new ticket number to thread title
Reason: Added new ticket number to thread title
Re: Path toolbox operation order
Open the "Job" by right clicking, and select the "Workplan" tab. Rearrange to your liking.
Gene
Gene
Re: Path toolbox operation order
That is absolutely super cool! Thanks!
Re: Path toolbox operation order
Hi,
Genes hint help a lot. Tnx
Result: the moved operation disappears in the list and is somehow detached from the 'operations' folder.
As a perfect workaround exists, can one of the experts tell if this is worth creating an issue in the tracker ?
anka
OS: macOS 10.15
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.19.22670 (Git)
Build type: Release
Branch: master
Hash: 12155f4aab09047c5697db0c1b3cf93b02edda03
Python version: 3.8.6
Qt version: 5.12.9
Coin version: 4.0.0
OCC version: 7.4.0
Locale: C/Default (C)
Genes hint help a lot. Tnx
til now, II also tried reordering operations the way described by levente. (double click operations, and follow instructions saying 'drag and drop')
Result: the moved operation disappears in the list and is somehow detached from the 'operations' folder.
As a perfect workaround exists, can one of the experts tell if this is worth creating an issue in the tracker ?
anka
OS: macOS 10.15
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.19.22670 (Git)
Build type: Release
Branch: master
Hash: 12155f4aab09047c5697db0c1b3cf93b02edda03
Python version: 3.8.6
Qt version: 5.12.9
Coin version: 4.0.0
OCC version: 7.4.0
Locale: C/Default (C)
Re: Path toolbox operation order
Anything that is "advertised" but does not work correctly is worth a bug report.
However, for me the drag and drop works just fine, as well as the job workplan edit method.
Therefore I suggest more discussion here before creating a bug report.
If you can add a sample file showing the problem that would be a good start.
Gene
However, for me the drag and drop works just fine, as well as the job workplan edit method.
Therefore I suggest more discussion here before creating a bug report.
If you can add a sample file showing the problem that would be a good start.
Gene
Re: Path toolbox operation order
Hi,
I attached 2 freecad files (fc1_before, fc1_after) - one before doing the operation, one saved after
The issue can be reproduced this way
1) Screenshot 1. double-click on operations
2) Screenshot 2. drag profile downwards and drop
3) Screenshot 3. click OK (profile has disappeared from list after dropping)
4) Screenshot 4. ComboView shows 'profile' detached from 'Operations'
anka
OS: macOS 10.15
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.19.22670 (Git)
Build type: Release
Branch: master
Hash: 12155f4aab09047c5697db0c1b3cf93b02edda03
Python version: 3.8.6
Qt version: 5.12.9
Coin version: 4.0.0
OCC version: 7.4.0
Locale: C/Default (C)
- Attachments
-
- fc1_before.FCStd
- (25.43 KiB) Downloaded 24 times
-
- fc1_after.FCStd
- (25.48 KiB) Downloaded 23 times
Re: Path toolbox operation order
It is a known issue, you may search tracker and forum for it. If no tracker entry exists, please create one.
You can reorder the operations in the Job. Double click the job and switch to the Workplan tab; use the arrow key for reordering.
You can reorder the operations in the Job. Double click the job and switch to the Workplan tab; use the arrow key for reordering.
A Sketcher Lecture with in-depth information is available in English, auf Deutsch, en français, en español.
Re: Path toolbox operation order
Interesting. I tried the experiment several times with very recent Windows versions of FC, both Conda and LibPack compilations, and the move worked perfectly every time.
No hint of any problem. No messages.
OS: Windows 7 SP 1 (6.1)
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.19.22670 (Git)
Build type: Release
Branch: master
Hash: 12155f4aab09047c5697db0c1b3cf93b02edda03
Python version: 3.8.6
Qt version: 5.12.9
Coin version: 4.0.0
OCC version: 7.4.0
Locale: English/United States (en_US)
OS: Windows 7 SP 1 (6.1)
Word size of OS: 64-bit
Word size of FreeCAD: 64-bit
Version: 0.19.22670 (Git)
Build type: Release
Branch: master
Hash: 12155f4aab09047c5697db0c1b3cf93b02edda03
Python version: 3.6.8
Qt version: 5.12.1
Coin version: 4.0.0a
OCC version: 7.3.0
Locale: English/United States (en_US)
Gene
Re: Path toolbox operation order
Hi Gene, Chris
the issue happes every time for me.
meanwhile I found that editing the Operations Group property allows to put back the 'detached' in the operations group.
I'll try around for a couple of day's - then create an issue in tracker
anka
the issue happes every time for me.
meanwhile I found that editing the Operations Group property allows to put back the 'detached' in the operations group.
I'll try around for a couple of day's - then create an issue in tracker
anka